Georgia Tech Athletic Association Golf Facility

A new era in the Georgia Tech golf program began in February 17, 2017 with the grand opening of the Noonan Golf Facility, a 13-acre complex on the edge of the Tech campus in midtown Atlanta where the Yellow Jackets can practice and work on every part of their games on a daily basis. There are seven greens, shaped bunkers and approaches, all built with golf architect Tom Fazio’s firm at the helm and former players like Matt Kuchar, Roberto Castro, Kris Mikkelsen and Carlt..

Read more
  • 26 views
  • 0 Comment

McCamish Pavillion

CLIENT: Georgia Tech Athletic Association LOCATION: Atlanta, GA SIZE: 8,600 seats COMPLETED: September 2012 ARCHITECT: Populus   McCamish Pavilion is a state of the art basketball facility and the new home of the Georgia Tech Yellow Jackets. The original steel roof structure is the only remaining element of this circa 1950s building. In order to preserve this artifact a ramp was built down to the court level to provide access for dump trucks, cranes and eart..

Read more
  • 23 views
  • 0 Comment

Georgia Tech Scoreboard

CLIENT: Georgia Tech Athletics Association LOCATION: Atlanta, GA COMPLETED: August 2009 DURATION: 3 Months ARCHITECT: ICON Architectural Group   SG Contracting was asked by the Georgia Tech Athletic Association and Georgia Tech Facilities to act as Construction Manager for the million dollar renovation of the Bobby Dodd Stadium at Historic Grant Field Scoreboard and Ribbon Boards. This work consisted of the complete demolition of the existing scoreboard and ..

Read more
  • 34 views
  • 0 Comment

Georgia Tech Bobby Dodd Stadium Suite Renovation

CLIENT: Georgia Tech Athletic Association LOCATION: Atlanta, GA SIZE: 5,000 SF COMPLETED: July 2009 DURATION: 4 months ARCHITECT: Populous   SG Contracting was selected by the Georgia Tech Athletic Association and Populous to construct new offices and a marketing suite for ISP Sports within Historic Bobby Dodd Stadium at Grant Field that overlooks the football field. The project involved the demolition of six existing suites to create the two spaces. Vital..

Read more
  • 48 views
  • 0 Comment

Georgia Tech Howell and Harrison 4-Pipe HVAC Conversion

CLIENT: Georgia Institute of Technology LOCATION: Atlanta, GA COMPLETED: April 2009 DURATION: 8 months ENGINEER: Concord Project Consulting   SG Contracting was awarded the mechanical renovation of two adjacent residence halls on the East Campus. The project consisted of turning a 2-pipe system into a 4-pipe system to allow simultaneous heating and cooling to different areas of the building. The scope included a new air handling unit, over 250 new fan coil u..

Read more
  • 27 views
  • 0 Comment

Emory Human Genetics

CLIENT: Emory University LOCATION: Decatur, GA SIZE: 1,100 SF COMPLETED: April 2009 DURATION: 2 weeks ARCHITECT: Emory University Interiors and Design   Emory Human Genetics consisted of a complete lobby and reception area renovation. The scope of the project consisted of 1,100 SF and work was performed in a 2 week time frame while the Human Genetics Lab, record keeping and business office remained operational. The Genetics Lab was directly adjacent to the..

Read more
  • 45 views
  • 0 Comment

Georgia Tech Advanced Wood Products Lab Expansion

CLIENT: Georgia Institute of Technology LOCATION: Atlanta, GA SIZE: 7,000 SF COMPLETED: December 2008 DURATION: 16 weeks ARCHITECT: Facility Group   The Wood Products Lab Expansion project combined the addition of 7,000 SF of covered conditioned space and installation of a wet pipe fire protection system to the existing 24,000 SF building and the addition. The expansion scope included the 7,000 SF pre-engineered structure; extension of electrical, gas and ..

Read more
  • 41 views
  • 0 Comment

Sigma Nu Fraternity House, Georgia Tech

CLIENT: Sigma Nu Housing Corporation LOCATION: Atlanta, GA SIZE: 15,000 SF COMPLETED: August 2007 DURATION: 12-month Project Schedule ARCHITECT: Richard & Wittschiebe, Janice Wittschiebe   SG Contracting carried out demolition of an old fraternity house followed by the construction of a new 20,000 square foot residence in the heart of Georgia Tech’s campus. This $4,000,000 project was completed ahead of schedule allowing the Owner to occupy the build..